Shortly before Christmas, there was a machine fire at one of our customers. As luck would have it, this machine was a bottleneck in the production line and was therefore used to capacity in 3 shifts. With our powerful team and decades of experience in the field of retrofitting, we were able to overhaul the machine within 20 weeks without any advance notice.
Machine type: Retco rotary transfer machine
The scope of the project includes a complete overhaul after a machine fire, including a control upgrade.
Quality acceptance: machine capability study